top of page

ANDOVER, MA

GENERAL CONTRACTOR

AZ Corp, a CIANBRO company

ENGINEER

CE&IC

ARCHITECT

CE&IC

Pfizer’s Andover campus is home to the company’s biopharmaceutical R&D and manufacturing operations. The project focused on expanding these operations in order to support the company’s future strategic objectives. The Pfizer-BioNTech COVID-19 Vaccine, which is based on BioNTech’s proprietary mRNA technology, was developed by both BioNTech and Pfizer.

FEATURES​​

NSMC was responsible for the Plumbing/Process Piping scope of work, including:

  • Specialized Laboratory Waste and Vent equipment and piping system

  • Compressed Air (CA) and Vacuum (VAC) Equipment and piping systems

  • CO2, N2, and O2 Piping Systems

  • RODI Water distribution system

  • Interior Domestic, Protected, and Tempered water piping

  • Emergency Shower & Eyewash fixture installation

  • SS Swagelok CUP Connections, Quick Connects and Valving to Lab Equipment

Pfizer

bottom of page